Ajmer Industrial Gases Pvt Ltd, situated in Rajasthan, epitomizes excellence in the gas manufacturing sector. Committed to delivering high-quality gases, it was founded with a mission to cater to diverse industrial needs. Through cutting-edge technology and stringent quality control measures, Ajmer Gases has emerged as a prominent supplier of industrial, medical, and specialty gases across Rajasthan.
Their dedication to innovation and customer satisfaction has solidified their position as a reliable gas provider, contributing significantly to the region’s industrial growth while ensuring safety and environmental standards are met.
As a result, over the last few years, the company has been actively looking at solar as a possible means to reduce its carbon footprint. This is where SafEarth came in and helped make their dream become a reality. The Ground Mounted OPEN ACCESS Solar installation of 1000 kW has helped Ajmer Industrial Gases Pvt Ltd reduce 2132 tonnes of CO2 emissions a year.
Project Details :
Characteristics | Value |
Size | 1000 kW |
Commercial Operation Date (COD) | July 2022 |
Type | Ground Mount |
Financing Mode | OPEN ACCESS |
Execution Time | 4 Months |
Annual Generation | 1,523,000 kWh |
CO2 Reduction | 2132 Tonnes |
Levelized Cost of Energy | > INR 1.8 / kWh |
*Graph of Total Annual Savings
The exact details are confidential. This is for visual representation only
The project closed with significant benefits to the off-taker and the company stands to save upwards of with the installation of the rooftop solar system by SafEarth.
Project Workflow
SafEarth is proud to be a part of this journey. This is how we helped their transformation:
Project Design:
Upon signing with Ajmer Industrial Gases Pvt Ltd, SafEarth first visited the site and made a detailed engineering report for the project. The designed system optimized the generation and the return on investment of the plant. Best industry practices have been used in this system.
Vendor Selection:
The SafEarth team then selected 15 pre screened vendors from the companies registered on our portal. All these companies are industry leaders. These companies were given a week to review the Detailed Engineering to help them ascertain their costs up to 99% accuracy. After that they selected a vendor from the 15 participating pre screened vendors and held final discussions with this vendor. We worked with them to iron out various terms and conditions of the contract to arrive at a Win-Win scenario. This ensured protections for the client as well as the vendor.
Installation:
The Vendor installed the plant by following the best in industry practices. The plant has been set up using premium components and has been designed for top-grade performance.
Quality Assurance by SafEarth:
Before Commissioning and Handing over the plant, the SafEarth quality team visited the site and identified any punch points related to the project. The plant was handed over only after resolving these punch points.
Operations and Maintenance:
The O&M for the plant is now being done by the Vendor. The contract sets out clear benchmarks against which the output of the plant will be evaluated.
Final Outcome of Project
SafEarth has helped Ajmer Industrial Gases Pvt Ltd reduce its carbon footprint by 2132 tonnes per year of CO2 equivalent and save over 80% of their electricity bills in the process. The Company was able to get the best quality solar plant without having to worry on any aspect of the project and as a result, they have awarded additional projects to SafEarth.
Ready to buy a solar system? Join us on our SafEarth Platform to get the best quality and prices for your system !
I do not even know how I ended up here but I thought this post was great I do not know who you are but certainly youre going to a famous blogger if you are not already Cheers
This stage is phenomenal. The brilliant substance exhibits the manager’s dedication. I’m overpowered and envision more such unfathomable entries.